Non Slip Double Handle Long Lead

Perfect for extra control and a longer lead for a more freedom to roam walk!!
Manufacturer: Hem and Boo
SKU: TL5730
£17.00

* Double Handle for Extra Control
* Durable and Strong
* Rubber Grip for All Weathers

 The Hem and Boo tdouble handle long lead is made from tightly woven nylon with interwoven rubber for extra grip and control.
A longer length lead to give your dog more freedom to explore and use their senses.

1.8M x 15mm